Customization: | Available |
---|---|
After-sales Service: | Online Technical Service |
Feature: | Safe |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Uses
Modular buildings may be used for long-term, temporary or permanent facilities, such as construction camps, schools and classrooms, civilian and camp housing, and industrial facilities. Modular buildings are used in remote and rural areas where conventional construction may not be reasonable or possible. Other uses have included churches, health care facilities, sales and retail offices, fast food restaurants and cruise ship construction. They can also be used in areas that have weather concerns, such as hurricanes.
2.Construction process
Modular components are typically constructed indoors on assembly lines. Modules' construction may take as little as ten days but more often one to three months. Completed modules are transported to the building site and assembled by a crane. Placement of the modules may take from several hours to several days.
Name |
modular prefabricated building / steel fabricated buildings |
Material |
Q235B,Q345B, Galvanized, Color Coated |
Main frame |
solid H-shape steel Beam |
Purlin |
C,Z-shape steel purlin |
Roof and wall |
a) Color-coated corrugated steel sheet; b) Rock Wool Sandwich Panels; c) EPS Sandwich Panels; d)Glass wool Sandwich Panels |
Door |
a)Rolling Gate; b)Sliding door |
Window |
PVC Steel or Aluminum Alloy |
Down spout |
Round pvc pipe |
Usage |
All kinds of industrial workshop, warehouse, supermarket, high-rise building, etc |
Service life |
50Years |
1. Are you a factory or trading company?
Henan Tiga Engineering Co., Ltd is a factory located in Henan Province, China.