Customization: | Available |
---|---|
After-sales Service: | Online Technical Service |
Warranty: | 20-30years |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Light Weight Corrugated Pre painted Steel Roofing Sheet
Prepainted Metal roofing Plate has many advantages, they are used mostly in constructions, such as roofing, wall panel, ceiling, wall cladding, etc. we have many years experiences in PPGI/PPGL manufacturing and exporting, our products have beed sold to America, Germany, France, Ireland, Egypt, Africa, India, etc. our customers are satisfied with our products, because we can supply high quality products with competitive factory price.
Technique of production |
Double painting and double baking process Double painting and one baking process |
Standard | AISI,ASTM,GB,JIS |
Material | SGCC,DX51D,DX52D,DX53D |
Brand | TIGA Steel |
Thickness | 0.13-1.20 mm |
Width | 665-1050mm |
Length | 2000-5000 meters(common) |
Tolerance | "+/-0.02mm |
Zinc coating | 30-275g/m2 |
Painting | Top: 15 to 25 μm (5 um + 12-20 μm) back: 7-12 μm |
Surface coating type |
PE(regular), SMP, HDP, PVDF |
Surface coating color |
ALLColors in RAL Cards |
Color coating Material |
PE, SMP, HDP, PVDF |
Certification | ISO 9001-2008,SGS,CE,BV |
MOQ | 25 TONS (in one 20ft FCL) |
Delivery | 15-25 days |
Monthly Output | 10000 tons |
Payment terms | 30%TT in advance as deposit +70% by TT before delivery |
Irrevocable 100% L/C at sight | |
Currency | USD, EURO |
Trade terms | EXW, FCA, FOB, CFR, CIF, CPT, CIP |
MOQ | 25 Tons |
Loading Port | Qingdao, China |
Transportation | by sea or by train |
Packing | Long distance seaworthy export packing |
Origin | China |
ID Coil | 508mm or 610mm |
Delivery Time | 10 days on receipt of down payment(cargoes in stock), or 25 days on receipt of Downpayment (without stock) |
Remarks | Insurance is all risks & war risks |
MTC 3.1 will be handed on with shipping documents | |
SGS inspection is acceptable |
1. How about the Delivery Time?